THANK YOU | SAVE £225 BOOK YOUR SURVEY NOW

Thank you for submitting your information. Book your site survey now and get a £225 warm welcome discount.

BUS SCHEME £7,500.00 SURVEY

In order to get your MCS BUS Scheme grant we must complete a full onsite survey, which includes the following:

  • MCS 031: Room by room heat loss survey
  • MIS 3005-D: Heat pump location design
  • EU 813/2013: Noise assessment db(A)
  • MGD 007: Installation assessment

This survey is fully refundable to your heat pump cost. 

 

Secure today:

£ 55,00

*this price doesn’t include transport costs if your location is more than 40 miles from any of our service centres. 

By clicking “Secure Today”, I agree to the MCS Survey Agreement, Terms and Conditions and Privacy Policy.

Reserve an onsite survey. We will call you to arrange at a time convenient. We also secure you a heat pump from our stock.

We will conduct a full onsite heat loss and efficiency review of your property to clearly understanding your costs and savings.

Our technicians will install and commission the system to Adlår's high standards.

NEXT STEPS

1. Understanding your fixed quote and performance report

  • We’ll send you your full report in an email.
  • We’ll reach out to you to discuss the report, and give you advice on whether a heat pump is right for you.

 

2. Site Survey

Our report provides a very accurate initial estimate, but we must conduct a detailed surveyors survey of your property to check the details.

Our onsite survey includes:

  • MCS 031: Room by room heat loss survey
  • MIS 3005-D: Heat pump location design
  • EU 813/2013: Noise assessment db(A)
  • MGD 007: Installation assessment

Why Adlår’s System?

  • Maximum control over heating and hot water temperature
  • Priority hot water and priority heating
  • Hot water directly from the heat pump into your radiators
  • Less high failure parts
  • Faster Install: Less costs
  • Higher Efficiency: More saving
1 DAY INSTALLS

Why so quick:

  1. Adlår’s own team of installers are specialised in our products, we keep variation down to a minimum, and optimise processes.
  2. Adlår’s specifically design the system with heat pumps in mind, reducing complex parts (also high failure parts) and with a direct route into your existing heat system (also better for getting heat in your home).
  3. Fjord I standalone cylinder separates your hot water and heating circuits allowing more flexibility on how we connect into your existing system. 

WHY FASTEST PAYBACK?

1. Direct from the manufacturer

When you come to Adlar, you’re coming directly to the manufacturer. So you benefit from a seamless process, right the way through from your instant quote, to your installation by a member of the Adlar team, to superb after-sales service.

2. Installation Time

We have optimised the installation of our heat pumps. Where most companies take 4-5 days to install, we can do it in 1.5 days or less.

This has the added benefit of reducing the impact to your comfort. as domestic hot water is nearly always active on day 1, with heating ON on the second day. In some cases, we only need to turn the heating off for a few hours.

3. A better, more efficient system

You can read more technical explanations by clicking on the link below on why our system has superior efficiency to conventional heat pumps.

A summary of these reasons are:

  • Hot water from the heat pump goes straight to your radiators
  • No losses in your pipes between the domestic hot water and the heating circuit
  • Heat pump is running constantly in a set temperature and alternating 1 degree at a time, rather than jumping to ~50 degrees for your hot water
  • Smaller heat pump for your domestic hot water, which runs more efficiently over a longer time, and allows the large unit to be off in the summer months.

MCS GRANT Site VISIT agreement

1. MCS Site Visit

Thank you for booking an onsite visit for your grant assessment. Following the placement of your order you will be contacted by our team to arrange a convenient time for one of our heat loss specialists to visit you.

2. Effective Date

Your assessment confirmation will take effect after (1) you have placed your order and (2) we have received your payment.

3. Rights

Your order guarantees one of our team will contact you to discuss arranging an onsite visit. 

It does not guarantee that we will conduct an onsite survey or that you are eligible for the MCS £7,500.00 grant. 

If after our sales team contact you it is deemed not possible to visit you and/or for you to obtain the grant, we will refund your payment. 

You are able to cancel your order at any time up to 24hrs before your site visit is arranged to take place, and you will also be refunded in full.

If you proceeding with ordering a heat pump from Adlår your order will be refunded against the price of the heat pump. 

4. Gratuities; Non-transferable

We will hold your order value specifically for the purpose of your onsite survey. Your order is not transferable or assignable to any other party without written consent.

You are aware that we will not hold your order separately or in an escrow or trust fund, nor will we receive any interest on your order payment.

You are able to get a refund of your payment upon request as detailed above.

5. Your data

We may ask you for information from time to time so that we can fulfil our obligations under these terms and conditions. We hold your personal data in accordance with our privacy policy, which can be found at adlar.co.uk.

6. Obligations

You are aware that this order does not impose any obligation on us to sell and/or supply goods, services or otherwise to you. 

We reserve the right to cancel your order at any time and for any reason (and without giving any reason), such as, but not limited to, an embargo, warfare, political instability or failure to reach a critical number of reservations in a particular area. After cancelling the order, we will refund the amount.

Free CONSULTATION:

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Unique ADLÅR FEATURES

Our ASHP cylinders produce cold air as a by product. In the winter we remove the waste air externally or into a dead space above insulation, but in the summer we can redistribute this cold air into your rooms.

If you have existing solar, these can be smartly connected to our heat pumps. This turns your cylinder into a thermal battery, working 3.8x more efficiently than a Solar iBooster.

When you only need hot water, and not heating, your outdoor unit can be turned off, just at the time you are actually likely to be in your garden.

Our cylinders can be equipped with an electric anode, which balances the mineral content of your water by filtering out calcium, extraneous particles, chlorine and heavy metals. The result is an almost neutral pH.

Unlike most heat pump systems, and heating systems in general, you either have hot water or heating. With Adlår’s dual heat pump system you always have both.